Thermo Fisher Scientific Advanced Mass Spectrometry Operator Training Courses.
|
These Isotope Ratio Mass Spectrometer operator training courses are designed for customers who have purchased the DELTA series, and MAT 252/253 with various interfaces and sample preparation units. The general objective of these training courses is to familiarize with the instrument features, vacuum system, ion source setting, basic instrument operations, instrument check and maintenance basics, software and trouble shooting. The instruments used for training will be DELTAplus Advantage, DELTAplus XP and MAT 253. The software used for training will be ISODAT 2.0. The training courses are specialized in the arrangement of two different interfaces and sample preparation units per course. Please select your course carefully according to the interfaces and sample preparation units that suits your needs best. Thank you. Participants' profile: General understanding of mass spectrometry (MS), English language, 3 - 6 months experience with the instrument. |
Please click here to register to a Course
Please download here the Training Brochure as PDF
Isotope Ratio Mass Spectrometers
|
|
| Training Course | Dates |
| Isodat Workshop Basic Software Training Advanced Software Training, Hardware programming | upon request |
| GB-EA: ConFlo III/IV and Elemental Analyzer and TC/EA Peripherals, GasBench II | 08.02. - 12.02.2009 |
| GC-LC: LC IsoLink , GC IsoLink | 15.02. - 19.02.2009 |
| GC-EA: GC IsoLink, ConFlo III/IV and Elemental Analyzer and TC/EA Peripherals | 15.02. - 19.02.2009 |
| GB-GC: GC IsoLink, ConFlo III/IV and GasBench II | 14.06. - 18.06.2009 |
| EA-GC: Elemental Analyzer and TC/EA Peripherals and GC IsoLink, ConFlo III/IV | 14.06. - 18.06.2009 |
| Dual Inlet: Dual Inlet and Peripherals / 3-day operator course | 20.10. - 22.10.2009 |
| EA-GB: ConFlo III/IV and Elemental Analyzer and TC/EA Peripherals, GasBench II | 25.10. - 29.10.2009 |
| EA-GC: GC IsoLink, ConFlo III/IV and Elemental Analyzer and TC/EA Peripherals | 01.11. - 05.11.2009 |
| LC-GC: LC IsoLink, GC IsoLink | 01.11. - 05.11.2009 |